EthernetSlipRings.com — Rotary Data Interface Request Worksheet BLANK ENGINEERING REQUEST TEMPLATE — NOT A TEST REPORT OR CERTIFICATE Contact: inquiry@ethernetsliprings.com Company / contact / company email: Quantity / destination / required date: Model or request reference / existing drawing revision: 1. DATA / VIDEO / RF / OPTICAL PATHS Each protocol and number of independent channels: Source / sink or camera / PLC / host model: Data rate, payload/frame format, bus cycle/topology, RF band or optical wavelength/mode: PoE PSE class / required PD power, or USB power-role/PD/alternate-mode needs: 2. ADDITIONAL POWER / CONTROL GROUPS For each group: description, circuits including returns, continuous/peak current, working voltage (AC/DC), peak duration / duty, AC frequency if applicable: Protective earth / grounding / insulation and separation requirements: 3. MECHANICS / ENVIRONMENT Requested mounting style, outside diameter, body length and mounting drawing: Optional center bore (ID), if needed: Continuous / peak RPM, rotation direction and continuous/indexing/oscillating duty: Temperature, vibration, cable routing and environment: Requested protection / sealing and proposed test conditions: For immersion: medium, depth and duration: 4. EACH PATH'S TERMINATIONS Stationary connector coding / pinout / requested lead length: Rotating connector coding / pinout / requested lead length: RF connector band/reference impedance or optical end-face/fiber type: 5. REQUESTED EVIDENCE AND ACCEPTANCE PLAN [ ] Outline / mounting drawing [ ] Pinout / lead identification [ ] 3D STEP availability review [ ] Appropriate Cat5e/Cat6 characterization scope [ ] Loaded rotating link / system test [ ] Protocol-specific USB / video / fieldbus scope [ ] Band-specific RF / VNA or optical scope Record: actual issuer, specimen/sample ID, drawing/report revision, test date, instrument and calibration identity, fixture/adapters and test reference plane. Specify: test limit, complete path, source/sink, power load, RPM/motion, observation duration, traffic/counter totals, units/convention and acceptance criteria. Identify: tested conditions, exceptions and untested conditions. Configuration targets require engineering review. A cable report is not a universal dynamic performance approval. Document and CAD availability, authorized use, configuration match, quotation and lead time are to be confirmed. Email the completed request to inquiry@ethernetsliprings.com.